OFFICE

CONTAINERS

Mobile Modular Building Solutions by CHV

CHV 300 3ER

Office Container Triple Module 20′

Series: CHV 300 3ER/ 305 3ER/ 316 3ER

Dimensions:
6,058 x 7,334 x 2,791mm
Interior height: 2.5m

  • Robust all steel construction

    Cold formed all-steel profiles with container corners

  • Fully Insulated

    Insulated wall and ceiling panels, floor made of cement-bonded chipboard

  • Modular & Stackable

    Modular construction stackable up to 3-high

FEATURES:
• Base frame bent/rolled
• Welded container corners
• Forklift pockets optional or by type
• Floor insulated with cement-bonded particleboard and PVC covering
• Floor loading capacity 250kg/m2
• Insulated wall and ceiling, external surfaces galvanized sheet metal, internal surfaces white chipboard or galvanized coated sheet metal
• One steel door and 6 windows with external shutters
• Color: exterior gray white, interior white or gray white

ELECTRICAL INSTALLATION ACCORDING TO ÖVE
• 3 power inlets and outlets 400V includes 3 junction boxes
• 6 light bars each 36W with light switch and 3 double sockets
• 3 wall convector heaters 2kW
• 3 ground connections

All cables along the walls are surface-mounted, ceiling cables are flush-mounted. (alternatively also flush-mounted on the walls in case of mineral wool)
– iincluding coupling material (inner cladding, floor flashing etc.) – WITHOUT MOUNTING!

Rental Inquiry Form

"*" indicates required fields

Delivery Location*
Name*
Address

CONTACT
Mrs. Daniela Thiem
+43 1 865 20 50 – 214
daniela.thiem@chv.at

Sales Inquiry Form

"*" indicates required fields

Delivery Location*
Name*
Address

CONTACT
Mr. Christian P. Rippler
+43 1 865 20 50 – 230
christian.rippler@chv.at

Motorcycle Showroom Vienna
Modular motorcycle showroom and sales offices at Faber Roller & Bike Shop Vienna. For the container based modular building approx. 20 office containers were used, the building was constructed in 2019.
Three-Story Modular Construction Office Vienna Airport
Three-story modular construction office Office Park 4 at the Vienna Airport, consisting of 87 office containers with a glass-fronted double container unit serving as conference room on the second floor. Year of construction 2019
Modular Office Building Collection Center for Hazardous Waste
Modular office building for the collection center for hazardous waste in the municipality of Mannersdorf realized in March 2019. The plant consists of a 20′ double container unit offering enough space for two full-fledged workplaces.
Modular motorcycle workshop
Modular service workshop at Faber Roller & Bike Shop in Vienna consisting of approx. 15 used office containers with double doors and ramps Year of construction 2019.
On-Site Construction Offices for Austro Control
Two-story modular building housing the temporary on-site construction offices for the Austro Control headquarters building project. The modular building is made up of of 29 containers where offices, meeting rooms, sanitary facilities, storage space and a staff-kitchen are housed. Built in 2019.
Modular Classroom Wiener Linien Training Center
Extension of the Wiener Linien training facility at their main production site in Vienna. The modular classroom boasts a ceiling height of 2,800 mm. It consists of 4 office container modules with custom windows for improved lighting conditions.

Subject to technical changes!
For details on custom options, container accessories and add-ons please refer to your individual quote.